b) Storage, manufacturing, paint storage, oil storage, spray booths shall be separated with non-hazardous buildings like administration etc.. c) For buildings used for petrochemicals the fire rating requirement shall be 240min d) Doors and windows opening in an external walls within 3m of the fire separating wall shall have minimum 60min fire rating assembly.